The key objectives of the assignment is to perform the assessment of the current status of about 350 rural water schemes dislocates in 22 Rwandan Districts to determine the allocation of water meters and chlorination units, developing the most cost-effective detailed study and developing final designs with drawings, construction details and supervision of works