Final design for the construction of the Putignano’s WWTP out let pipeline. The diameter shall be DN 500 for a total length of 19  km and the material selected is GRP. The project includes a Pumping station for the maximum design flow rate of 150 l/s and an hydraulic disconnector.

YEAR 2009 – 2013
COUNTRY Italy
CLIENT AQP Acquedotto Pugliese SpA