Final design for the construction of the Putignano’s WWTP out let pipeline. The diameter shall be DN 500 for a total length of 19 km and the material selected is GRP. The project includes a Pumping station for the maximum design flow rate of 150 l/s and an hydraulic disconnector.
YEAR | 2009 – 2013 |
|
COUNTRY | Italy | |
CLIENT | AQP Acquedotto Pugliese SpA |