Technical Assistance to the ACEA spa water utility (Roma)
Technical Assistance Program to the ACEA spa water utility in the implementation of water & wastewater projects in the Lazio District (Year 2006).
Technical Assistance Program to the ACEA spa water utility in the implementation of water & wastewater projects in the Lazio District (Year 2006).
The overall objective of the project is the provision of consultancy to develop a deeper understanding on the Afghanistan’s rural water sector development needs and recommend actions to improve the sector and its agencies’ performance to deliver services to the communities using “CDD approach” (that include institutional systems, monitoring systems, participation of community etc).
Preparation of conceptual and detailed design and tender documents for the Morphou/Güzelyurt’s water reuse scheme to safely irrigate cultivated areas surrounding the sewage treatment plant with reclaimed water. The irrigation scheme includes also the construction of a water reservoir to buffer seasonal imbalances between reclaimed water demand and supply.
Review and analysis of the documentation provided, concecptal design, pryority investments, preliminary costs and layouts, preparation of Cost-benefi Analyses.
Support Action stakeholders in the monitoring and implementation of program activities, including the monitoring of: the recommendations of the technical and financial audit mission; the recommendations of the various meetings Steering Committee, Operational Monitoring Committee (CSO) and bi-monthly follow-up meetings); preparation of program indicators.
Ensure the design of monitoring tools recommendations and program indicators; Contribute in the Water sector in OMD program, and specifically in the monitoring context of regular audit recommendations. Supporting the OMDs program will be secondary to the support given to the PAEPA program.
The activity includes the execution of geological survey and water well stress tests suitable to verify the quality and quantity of the water wells, capable to meet the increasing demand for water by the camp population. The survey/site assessment includes investigative works and tests.
The project entails the Preliminary and Final design of the Tirana selected water supply and sewerage systems remedial works.The Lot 2 project includes the rehabilitation of the following main selected sewage facilities: Goge, Irfan Tomini, Selita areas.
The overall objective of the project is the provision of consultancy to develop a deeper understanding on the Afghanistan’s rural water sector development needs and recommend actions to improve the sector and its agencies’ performance to deliver services to the communities using “CDD approach” (that include institutional systems, monitoring systems, participation of community etc).
Final design and Bidding Documents preparation of the rehabilitation and upgrading of the NVDA irrigation system (component 1), main canal, secondary structures, and larger tertiary structures serving about 25,000 ha. Final design and Bidding Documents preparation for the Northern Basins Program & Flood Management Program (component 2). Supervision of works, of the above two (2) contracts packaging.
Feasibility study, final design and tender documents preparation for the construction works of the water supply systems of n° 7 town/villages of Republique of Tchad, in particular Abougoudam, Goz Beida, Ba Illi, Linia, Bere, Bebedja, Bedjondo